The Challenge
The challenge was to create a safe, accessible corridor linking two areas of the school without disrupting learning. The new structure needed to blend seamlessly with existing buildings while improving movement and visibility during busy times.
Project Images
The Solution
A carefully managed build focused on safety, integration and minimal disruption.
- Established secure, segregated work zones with full DBS-checked staff.
- Constructed new strip footings, walls and matching brickwork to blend with existing façades.
- Installed new aluminium doors, windows and warm-deck roofing systems.
- Coordinated with the school’s fire and entry system providers for seamless integration.
The Result
A modern, fully integrated corridor delivering long-term safety and accessibility improvements.
- Improved pupil flow and reduced congestion across the site.
- Enhanced safeguarding visibility for staff during transitions.
- Seamless architectural match with existing school buildings.
- Delivered with zero disruption to teaching and learning activities.
"Just wanted to pass on my thanks to Andy, Harry and the rest of the team for the great work they’ve been doing on site during the walkway project. Andy in particular has been brilliant at keeping me fully updated with progress and working flexibly around any issues as they’ve arisen. It has been challenging having no walkway connecting the schools, but he has made the whole process as seamless as possible. It’s been a pleasure having him and the team on site."
Need a School Refurbishment Expert?
Let FDL Contractors deliver your project with quality, efficiency and complete care.
Get in touch